By God's grace work is continuing to complete as much as possible outside work before winter sets in. Stucco work is continuing in the Cemetery Chapel which will be followed by the placing of a new floor as it is raising due to water absorption, fixing the interior to prevent leaks and upgrading the electrical work. The summer kitchen that is used as an extra trapeza for pilgrims and the music school was found to be in a very bad condition with much of the framing having decayed right through. Also roof repairs are being made where needed before winter sets in. God willing plumbing work will begin during the winter.
|
|